Saudi Arabia - joining the dots

A series of blog entries exploring Saudi Arabia's role in the oil markets with a brief look at the history of the royal family and politics that dictate and influence the Kingdom's oil policy

AIM - Assets In Market

AIM - Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Iran negotiations - is the end nigh?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Yemen: The Islamic Chessboard?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Acquisition Criteria

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Valuation Series

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Showing posts with label Bambo. Show all posts
Showing posts with label Bambo. Show all posts

Friday 9 November 2018

The Gambia's Samo-1 well disappoints


The JV in offshore Blocks A2/A5 has announced a disappointing result on the Samo-1 well. The JV, which comprises FAR Limited 40%, Petronas 40% and Erin Energy 20%, has hit water.

FAR Limited had prospective P50 resource estimates of 825mmbbl (gross unrisked) with a 55% geological chance of success. Wireline logs indicate that the target was water bearing. The Government of Gambia has now granted a six month extension to end of June 2019 to enable a thorough evaluation of the Samo-1 well result.

The blocks contain numerous other prospects including Saloo and Bambo for follow-up exploration. The findings from Samo-1 will guide next steps.

In the meantime, FAR Limited and its partners are continuing with the SNE development with development plans recently submitted to the Government of Senegal. FID for this 500+mmbbl development is targeting for end 2019 with first oil in 2022.


Related links: