Saudi Arabia - joining the dots

A series of blog entries exploring Saudi Arabia's role in the oil markets with a brief look at the history of the royal family and politics that dictate and influence the Kingdom's oil policy

AIM - Assets In Market

AIM - Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Iran negotiations - is the end nigh?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Yemen: The Islamic Chessboard?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Acquisition Criteria

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Valuation Series

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Showing posts with label Wintershall DEA. Show all posts
Showing posts with label Wintershall DEA. Show all posts

Tuesday, 16 April 2019

Further positive momentum at Zama

The Zama-2ST1 well (side-track well son Zama-2) encountered 873ft of gross oil bearing column with a net-to-gross ratio of c.70%. The well flowed at 7.9mboepd of which 94% was light 26-30 API oil. The well results indicated a prolific reservoir and potential to achieve significant plateau rates at the field. The operator estimates that a peak production of 150-175mboe/d is achievable.

This news is positive for the recoverable reserves of the field and could tighten the current estimates range of 400-800mmboe upwards.

The rig will now move to drill the Zama-3 well, the last in the 2019 campaign, and should confirm the extent of the field to the south. The drilling programme remains ahead of schedule with the Zama-2ST1 completed 9 days ahead of schedule and 16% below budget.

The Zama field is planned to be developed from a single drill centre with drilling from the platform. Three production platforms are envisaged, each with capacity of up to 100mbopd. Produced oil is planned to be transported via a pipeline to the Dos Bocas terminal located onshore, c.70km away from the field.

The Zama partners are: Talos (35% operator), DEA (40%) and Premier Oil (25%).

For Premier Oil, this development could overtake the Sea Lion development in the Falklands (another large resource optionality for the company), adding visibility to additional near-term production growth.

Premier Oil also has a non-operated interest in Block 30 which could see Mexico transform into another important leg of its portfolio.




Block 30 is operated by DEA 40% with partners Premier Oil 30% and Sapura Energy 30%.

See also Premier success at Zama on the Zama-2 result in January 2019.

Premier Oil Camarco RBC Capital Markets