Saudi Arabia - joining the dots

A series of blog entries exploring Saudi Arabia's role in the oil markets with a brief look at the history of the royal family and politics that dictate and influence the Kingdom's oil policy

AIM - Assets In Market

AIM - Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Iran negotiations - is the end nigh?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Yemen: The Islamic Chessboard?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Acquisition Criteria

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Valuation Series

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Showing posts with label Catcher. Show all posts
Showing posts with label Catcher. Show all posts

Wednesday, 27 December 2017

Premier's Christmas present



Premier Oil announced today that the Catcher field achieved first oil on 23rd December, on schedule and almost 30% below budget. Initial production will be c.10mbopd as gas processing and water injection modules are commissioned. Production will be ramped up in phases through H1 2018 as the Varadero and Burgman fields are brought onstream increasing production to 60,000mboepd (gross).

The Catcher partners are Premier Oil (50% operator), Cairn Energy (20%), MOL (20%) and Dyas (10%). For Premier Oil, Catcher will account for c.25% of 2018 production with successful ramp up of the field important to deleveraging the balance sheet next year. For Cairn, this will diversify the production base following first oil at Kraken (29.5% interest) earlier this year.

Monday, 9 October 2017

Catcher if you can

The Catcher FPSO has arrived on schedule into the North Sea. The vessel is currently at Nigg performing crew changes and resupply ahead of moving to the Catcher field location.

The field remains on track to come onstream by the end of the year. Tweleve wells have been completed ahead of first oil and drilling has been better than expected, encountering 30% more net pay with 40% better well deliverability. As a result, expected plateau production has increased by 20% to 60mboepd. There is potential for a reserves upgrades above the existing 96mmboe 2P. The well results also reduce the total wells required from 20 to 18.

Monday, 28 August 2017

Sail-away to Catcher

The Catcher FPSO sailed away on 26th August from Singapore. It will take around 45 days to reach the UK North Sea, following which it will be connected and commissioned, a process expected to take 60-65 days with first oil targeting December.

The project is on schedule and c.30% below budget. Development drilling results have been promising with 30% more net pay and 40% better well deliverability. Expected plateau will now increase by 20% to 60mboepd with a potential for reserves upgrade from the 96mboe 2P at sanction.
The Catcher field partners are: Premier 50% operator, Cairn Energy 20%, MOL 20% and Dyas 10%.