Saudi Arabia - joining the dots

A series of blog entries exploring Saudi Arabia's role in the oil markets with a brief look at the history of the royal family and politics that dictate and influence the Kingdom's oil policy

AIM - Assets In Market

AIM - Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Iran negotiations - is the end nigh?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Yemen: The Islamic Chessboard?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Acquisition Criteria

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Valuation Series

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Showing posts with label Okume. Show all posts
Showing posts with label Okume. Show all posts

Wednesday, 25 April 2018

Tullow: An African update

Tullow provided a trading update today which gives an overview on progress across a selection of Africa's key fields and developments.

Ghana

  • Production in Q1 2018 at Jubilee averaged 63.8 mbopd - there were 19 days of shut-ins throughout the period. An updated shut-in/maintenance schedule plans for three weeks of downtime in May and one week at year end for a total of 47 days. Tullow’s production is insured at c.USD60/bbl, but with Brent to date hovering above USD70/bbl the company is incentivised to minimise down time.
  • TEN production performed strongly at 68.6b mbbl/d.


Equatorial Guinea

  • Ceiba and Okume in Equatorial Guinea performed "particularly well".
  • These fields are under new ownership with Kosmos and Trident Energy's entry in October 2017, acquiring Hess' stake for USD650 million.


Uganda

  • FID on Lake Albert is now expected in H2 2018 and the JV continues to await approval of the farm-out to CNOOC and TOTAL.


Kenya

  • The appraisal campaign continues to be positive with the project slowly moving forward.
  • The FEED contract is expected to be awarded imminently, and trucking for the Early Oil Production Scheme is scheduled to commence in the coming months.