Saudi Arabia - joining the dots

A series of blog entries exploring Saudi Arabia's role in the oil markets with a brief look at the history of the royal family and politics that dictate and influence the Kingdom's oil policy

AIM - Assets In Market

AIM - Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Iran negotiations - is the end nigh?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Yemen: The Islamic Chessboard?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Acquisition Criteria

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Valuation Series

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Showing posts with label Sebuku. Show all posts
Showing posts with label Sebuku. Show all posts

Sunday, 27 July 2014

Sebuku PSC

Overview

  • Contains 2 discoveries: Ruby gas field and the small Pangkat oil deposit
  • Plan of development for Ruby approved in July 2008
    • incorporates two bridge-linked platforms and initially four development wells
    • 312km pipeline to transport gas to new onshore receiving terminal for processing
    • Gas sold to the local Kaltim fertiliser plants
  • Ruby currently contracted to supply 85mmcfpd
    • Production capacity of 115mmcfpd, so scope to provide more gas
Participation
  • Mubadala (70%*), INPEX (15%), Total (15%)

Exploration
  • 11 wells drilled to date
  • Latest activity: Mubadala returned to drilling on the PSC in March 2010 - drilled NW Ruby-1 wildcat to test satellite prospect - unsuccessful
  • Further exploration planned
    • In March 2013, Mubadala awarded exploration block for the acreage surrounding Sebuku PSC, the West Sebuku block; 3D scheduled in 2014 with view to identifying future exploration prospects
Reserves, production and sales
  • Commercial WM: 215mmcfd (gross at 1/1/2014)
  • Production began in 2013 at 14mmcfpd, ramping up to 75mmcfpd in 2014
  • GSA signed in June 2011 for the supply of gas for 10 years to PT Pupuk Kaltim at c.80mmcfpd
    • Ruby gas to be predominantly used for fertiliser plant operations of the Kaltim V plant; however, as field declines, gas from other PSCs will be required to fulfil GSA
    • Price formula reflects local pricing and international ammonia and urea costs
      • Estimated USD/mcf: 2013 (7.7), 2014 (7.1), 2015 (7.0), 2016 (6.7)
Development
  • Currently produces from 4 wells, with additional drilling in future depending on reservoir performance
  • Installation/construction of onshore facilities finished at end 2012, offshore platforms in June 2013
  • First gas in October 2013
Fiscal and NPV
  • First Tranche Petroleum at 20%
  • Post-tax profit gas split is 65:35 in the government's favour; 80:20 for oil
  • Corporate tax of 40%
  • DMO applied at 6.7% after 60-month holiday, reimbursed at 15% of export price