Saudi Arabia - joining the dots

A series of blog entries exploring Saudi Arabia's role in the oil markets with a brief look at the history of the royal family and politics that dictate and influence the Kingdom's oil policy

AIM - Assets In Market

AIM - Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Iran negotiations - is the end nigh?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Yemen: The Islamic Chessboard?

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Acquisition Criteria

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Valuation Series

Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum Lorem Ipsum

Showing posts with label EastMed. Show all posts
Showing posts with label EastMed. Show all posts

Tuesday, 21 August 2018

Energean bearing fruit in the Eastern Med


Energean has published a new CPR highlighting the conversion of 2C resources into 2P reserves at the Karish and Tanin fields. Net 2P reserves for the fields now stands at 298mmboe with 22tcf gas and 32mmbbl liquids (gross) being upgraded. The company’s net 2P reserves including its Greek fields are now at 349mmboe.

A further 0.2tcf gas and 1mmbbl liquids remain in contingent resources relating to the Karish B reservoir and will be upgraded upon successful well production testing.

Energean is now thinking beyond its flagship development project with the recent award of its exploration acreage offshore Israel (Blocks 12, 21-23 and 31). These are estimated to contain 7.5tcf gas and over 100mmbbl liquids prospective resources. This massively enlarges the company’s exploration portfolio beyond the 1.3tcf Karish North prospect being drilled in early 2019. The company has secured an extension on the drilling rig for further exploration drilling should it have matured targets over the next 12 to 18 months.

#Karish #Tanin # Israel #Energean #EastMed #Greece