Monday, 3 July 2017

Brasse flow test shows promising results

Brasse was discovered in June 2016 and following a side-track, recoverable resources were estimated at 43 – 80mmboe. On 3rd July, a little after a year the original discovery was made, Faroe has reported successful flow testing achieving a maximum rate of 6,187mboepd. An upcoming side-track is planned, following which the resource estimates may be updated.

An extensive data acquisition programme was undertaken including a Drill Stem Test, logging, core and fluid sampling. The well showed excellent permeability, similar crude quality to the nearby Brage field (36-37˚ API), no undesirable components and no sand or water.

The results are positive for the future of the field and should help Faroe and its partner (each with 50% WI) in considering the development of the field. Brasse lies c.15km from both the Brage and Oseberg Sør fields and will be developed as a tie-back to one of these. The results could also provide valuable data and validation to support a farm-out which could help accelerate the development.

Source: Faroe June 2016 Investor Presentation

Source: Faroe June 2016 Investor Presentation


0 comments:

Post a Comment