Lamantin-1 on Block C-12 offshore Mauritaniawas was drilled to a TD of 5,150m and designed to evaluate a previously untested structure. The logs and samples collected suggests the reservoir objective was water bearing with small amounts of hydrocarbons. The well will now be plugged and abandoned.
Kosmos will drill the Requin Tigre prospect next and is targeting 60tcf. The well is epected to take around 60 days.
Tuesday, 12 December 2017
Kosmos dry well at Lamantin
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment