- Oryx holds 65% WI in Hawler licence (Operator), KNOC (15%), KRG (20%)
- On 19 May 2014, announced test results for Demir Dagh-3 ("DD-3") and Demir Dagh-5 ("DD-5") wells
- DD-3: all four tests flowed successfully; crude quality similar to that at DD-2 and -4
- Spudded in November 2013, 3km south-east of DD-2
- Will now be completed as producer with DD-2 and -4
- DD-5: Logging data and drilling fluid losses during drilling, only small amount of hydrocarbons recovered to surface
- First production from Demir Dagh Area expected Q2 2014
- DD-6 plus a further 4 appraisal/development wells to be drilled in 2014 to:
- further increase production capacity
- delineate reservoir
- DD-6 well now spudded
- Oryx also holds a 50% WI in Wasit, Kurdistan
- Wasit is close to the super-giant East Baghdad field
- 5 leads identified with 404mmbbl gross unrisked prospective resources
- Seismic has been planned on the licence in 2014
0 comments:
Post a Comment